Gromep

Electromechanical

Contracting Company

Loading

MEP Contracting · Baku & Ankara

We build the systems that make buildings work.

Turnkey mechanical, electrical and low-current contracting for every kind of building — from airports and industrial plants to offices, hotels and residences. Azerbaijan and Türkiye, since 2018.

Standards we work to
ASHRAE 90.1EN 13779NFPA 13NFPA 20NFPA 72IEC 61439IEC 60364ISO 14644-1ASHRAE 90.1EN 13779NFPA 13NFPA 20NFPA 72IEC 61439IEC 60364ISO 14644-1
30
Reference projects
24
Completed
6
On site now
2018
Operating since
33
Systems in scope

02 — Scope of works

Mechanical, electrical and low-current — under one contract

Three branches, one site team. Pick a branch to see where it sits in a building and what it covers.

Isometric schematic of a building showing mechanical, electrical and low-current system layers

Illustrative schematic — not a specific project.

Heating, cooling, water, steam and fire protection: everything that moves air and fluid through a building.

  • Heating & ventilation control, central heating
  • Ventilation, air conditioning, cold rooms
  • Process piping — steam, superheated and hot water
  • Plumbing: clean & waste water, drainage, rain water, irrigation
  • Fire protection & sprinkler systems
  • Hospital hygienic systems, HEPA & laminar flow
  • Kitchen & laundry facilities
  • Industrial installation & infrastructure works

Power from the grid connection to the last socket, plus earthing, protection and lighting.

  • Power generation & distribution
  • HV distribution networks & switchgear centres
  • LV distribution systems & boards
  • Grounding & lightning protection
  • Cathodic protection
  • Uninterruptible power supply (UPS)
  • Internal, external & special-purpose lighting
  • Dimmer installations

Detection, communication, security and control — the systems that make a building respond.

  • Fire alarm & detection
  • Process control & instrumentation
  • Telephone networks (incl. PABX)
  • CCTV
  • Central antenna TV (MATV)
  • Security systems
  • Automatic control / building automation

33 systems in scope · Full list on Solutions →

03 — How we work

From survey to handover

Six stages, one team — the same engineers follow a project from the first site survey to the handover file.

Stage
Project timelineSite surveyHandover
  1. 01

    Survey and engineering design

    Architectural and structural drawings are reviewed; heating and cooling loads, flow rates and power demand are calculated, equipment is selected and the installation drawings are prepared.

  2. 02

    Coordination modelling

    Mechanical, electrical and low-current routes are brought together in a single three-dimensional model. Clashes with other disciplines are resolved before they reach site and the approved fabrication drawings are issued.

  3. 03

    Procurement

    Equipment and materials that meet the specification are selected, suppliers are evaluated, and ordering, import and the site delivery schedule are managed.

  4. 04

    Site installation

    Installation is carried out by our own crews, with fabrication checks, programme and safety follow-up, and progress reporting throughout.

  5. 05

    Testing and commissioning

    Systems are tested, adjusted and balanced, and their performance is verified against the design values before the building is put into use.

  6. 06

    Handover

    As-built drawings, O&M manuals and test records are handed over as one file; the operating team is trained and the systems pass into the warranty period.

Illustrative sequence — stages overlap and durations depend on the project.

04 — Hire us

Tell us about your project

Send the building type, area and the systems you need. We come back with a technical and commercial proposal.

Fuzuli International Airport terminal

05 — Offices

Baku and Ankara

Reach the office closest to your project.