
Projeler Ticari · Azerbaycan · 2024–2025
CDP Residences (Place Tower Levels 08 to 28 & Townhouses Level 06, 07) Tenant Area
İş kapsamı
Fire Fighting Works
All stages of the project, including design development, interior planning, preparation of drawings, selectionof materials, procurement, delivery, installation, commissioning, testing and performance assessment ofequipment, have been successfully completed. The internal scope of works comprised finishing activities, along with electrical and mechanical systems.
Benzer bir proje mi?
Kapsamı gönderin, fiyatlandıralım
Yapı tipi, alan ve ihtiyaç duyduğunuz sistemler — teknik ve ticari teklifle dönelim.




